The ductwork decides more than the equipment does
A system can be sized right and still cost more to install if the ducts can't handle the airflow it needs. Undersized or leaky runs sometimes need rework before the new unit can perform the way it's rated to. That's labor a straight equipment swap doesn't carry.







