The line set and the wall decide the labor
Running refrigerant line between the outdoor unit and each indoor head takes drilling, mounting, and a vacuum pump to pull air and moisture out of the line before it ever gets charged. A straight run through one wall to a nearby outdoor pad is quick work. A run that climbs through an attic, turns a few corners, or reaches a condenser set far from the house takes longer and uses more line, and every added foot is something the installer has to buy and run by hand.







